AIM #3 is a premium quality, single component waterproofing coating that is especially designed to waterproof building foundations. It is resistant to sulfates, soil contaminants, bacteria, and other environmental conditions. AIM #3 is designed for permanent flexibility and toughness, to bridge and move with hairline cracks, and to resist impingement attack.
- Sets quickly and begins to cure immediately after application
- Remains flexible and tough
- Highly penetrative and workable
- Extremely durable and waterproof
- Prevents damage from water, even under ponded conditions
- Possesses a 20-year life expectancy
- Can be applied at any temperature; not affected by sudden rain
- Provides vapor barrier waterproofing for floors and walls in freezers, walk-in coolers and blast refrigerators.
- Impermeability to gas diffusion seals, floors and walls against radon and obnoxious effluvia.
- Protects the walls and doors of malting facilities and mushroom houses from steam infiltration.
- Seals the walls, floors and insulation of wood drying kilns, resists tannins, etc.
Can be used over below pavers, concrete, fibreglass composites, insulation, most metals, mineral composites, wood, wood composites, rubber/plastic composites, and other surfaces.
Surfaces to be coated must be dry and free of loose debris, dirt, oil, grease, or any substance that would interfere with proper bond. All repairs to the substrate must be completed prior to application of AIM#3. AIM #3 may be applied straight from the container after 2 minutes of low speed mechanical stirring. Apply the product using brush, roller, or airless spray technique. If airless spray application is desired, a custom blended AIM #3 version is available to be used with the following equipment: ratio 30:1 or 40:1 with a ½” or ¾” hose and a #35 or larger tip. A shorter hose will increase output at the tip.
Apply AIM #3 in a smooth, even fashion to achieve a uniform coating thickness in either 1 or 2 coats. Equipment may be cleaned with xylene or toluene before AIM #3 begins to dry.
Equipment may be cleaned with xylene or toluene before AIM #3 begins to dry.
Do not apply to wet or frozen surfaces that are saturated with moisture. Surface must remain at least 5°F above Dew Point during the application and curing process. Proper surface preparation and priming where indicated are important to product performance.
Shelf life is 12 months when stored indoors in factory sealed containers. This product is combustible. Keep away from heat, sparks, and flames. Use only EP rated equipment.
Read the container label warning and Material Safety Data Sheet (MSDS) for important health and safety information prior to the use of this product.
Keep out of reach of children and pets.
For additional information, contact our Technical Department.
Notice: The information presented herein is based on tests and data that Andek Corporation believes to be reliable. It is intended for use by technically qualified personnel at their own discretion and risk. Since conditions of handling and use are beyond our control, we make no warranties, express or implied, and assume no liability in connection with any use of this information. Nothing herein is to be construed as a license to operate or a recommendation to infringe any patent.